| Abstract: | Sediment is a primary constituent of concern for Chesapeake Bay due to its effect on water clarity. Accurate representation of sediment processes and behavior in Chesapeake Bay watershed model is critical for developing sound load reduction strategies. Sediment calibration remains one of the most difficult components of watershed-scale assessment. This is especially true for Chesapeake Bay watershed model given the size of the watershed being modeled and complexity involved in land and stream simulation processes. To obtain the best calibration, the Chesapeake Bay program has developed four different strategies for sediment calibration of Phase 5 watershed model, including 1) comparing observed and simulated sediment rating curves for different parts of the hydrograph; 2) analyzing change of bed depth over time; 3) relating deposition/scour to total annual sediment loads; and 4) calculating "goodness-of-fit‘ statistics. These strategies allow a more accurate sediment calibration, and also provide some insightful information on sediment processes and behavior in Chesapeake Bay watershed. |
| Genre: | Conference Paper |
| ProdID: | 70027581 |
| Citation Author: | Wu, J.; Shenk, G. W.; Raffensperger, J.; Moyer, D.; Linker, L. C. |
| Citation Contributing Office: | |
| Citation Datum: | |
| Citation Day: | |
| Citation Edition: | |
| Citation Editor: | Moglen G.E. |
| Citation End Page: | |
| Citation Issue: | |
| Citation Keywords: | |
| Citation Language: | English |
| Citation Larger Work Title: | Proceedings of the 2005 Watershed Management Conference - Managing Watersheds for Human and Natural Impacts: Engineering, Ecological, and Economic Challenges |
| Citation LatN: | |
| Citation LatS: | |
| Citation LonE: | |
| Citation LonW: | |
| Citation Month: | |
| Citation No Pagination: | |
| Citation Number Of Pages: | |
| Citation Online Only Flag: | |
| Citation Phsyical Description: | |
| Citation Projection: | |
| Citation Public Comments: | |
| Citation Publisher: | |
| Citation Series: | |
| Citation Series Code: | |
| Citation Series Number: | |
| Citation Search Results Text: | Sediment calibration strategies of Phase 5 Chesapeake Bay watershed model; 2005; Conference Paper; Proceedings of the 2005 Watershed Management Conference - Managing Watersheds for Human and Natural Impacts: Engineering, Ecological, and Economic Challenges; Wu, J.; Shenk, G. W.; Raffensperger, J.; Moyer, D.; Linker, L. C. |
| Citation Start Page: | 133 |
| Citation Volume: | |
| Citation Year: | 2005 |
| Type: | citation/reference |
| Text: | Sediment calibration strategies of Phase 5 Chesapeake Bay watershed model; 2005; Conference Paper; Proceedings of the 2005 Watershed Management Conference - Managing Watersheds for Human and Natural Impacts: Engineering, Ecological, and Economic Challenges; Wu, J.; Shenk, G. W.; Raffensperger, J.; Moyer, D.; Linker, L. C. |
| URL (THUMBNAIL): | http://pubs.er.usgs.gov/thumbnails/outside_thumb.jpg |
| Date Other: | Sat, 1 Jan 2005 00:00 -0600 |
| Publisher: | |