| Abstract: | FutureGen, as originally planned, was to be the world‘s first coal-fueled, near-zero emissions power plant with fully integrated, 90% carbon capture and storage (CCS). From conception through siting and design, it enjoyed strong support from multiple stakeholder groups, which benefited the overall project. Understanding the stakeholder engagement process for this project provides valuable insights into the design of stakeholder programs for future CCS projects. FutureGen is one of few projects worldwide that used open competition for siting both the power plant and storage reservoir. Most site proposals were coordinated by State governments. It was unique in this and other respects relative to the site selection method used on other DOE-supported projects. At the time of site selection, FutureGen was the largest proposed facility designed to combine an integrated gasification combined cycle (IGCC) coal-fueled power plant with a CCS system. Stakeholder engagement by states and the industry consortium responsible for siting, designing, building, and operating the facility took place simultaneously and on parallel tracks. On one track were states spearheading state-wide site assessments to identify candidate sites that they wanted to propose for consideration. On the other track was a public-private partnership between an industry consortium of thirteen coal companies and electric utilities that comprised the FutureGen Alliance (Alliance) and the U.S. Department of Energy (DOE). The partnership was based on a cooperative agreement signed by both parties, which assigned the lead for siting to the Alliance. This paper describes the stakeholder engagement strategies used on both of these tracks and provides examples from the engagement process using the Illinois semi-finalist sites. ?? 2011 Published by Elsevier Ltd. |
| Genre: | Conference Paper |
| ProdID: | 70034789 |
| Citation Author: | Hund, G.; Greenberg, S. E. |
| Citation Contributing Office: | |
| Citation Datum: | |
| Citation Day: | |
| Citation Edition: | |
| Citation Editor: | |
| Citation End Page: | 6225 |
| Citation Issue: | |
| Citation Keywords: | |
| Citation Language: | English |
| Citation Larger Work Title: | Energy Procedia |
| Citation LatN: | |
| Citation LatS: | |
| Citation LonE: | |
| Citation LonW: | |
| Citation Month: | |
| Citation No Pagination: | |
| Citation Number Of Pages: | 8 |
| Citation Online Only Flag: | |
| Citation Phsyical Description: | |
| Citation Projection: | |
| Citation Public Comments: | |
| Citation Publisher: | |
| Citation Series: | |
| Citation Series Code: | |
| Citation Series Number: | |
| Citation Search Results Text: | Dual-track CCS stakeholder engagement: Lessons learned from FutureGen in Illinois; 2011; Conference Paper; Energy Procedia; Hund, G.; Greenberg, S. E. |
| Citation Start Page: | 6218 |
| Citation Volume: | 4 |
| Citation Year: | 2011 |
| Type: | citation/reference |
| Text: | Dual-track CCS stakeholder engagement: Lessons learned from FutureGen in Illinois; 2011; Conference Paper; Energy Procedia; Hund, G.; Greenberg, S. E. |
| URL (THUMBNAIL): | http://pubs.er.usgs.gov/thumbnails/outside_thumb.jpg |
| URL (DIGITAL OBJECT IDENTIFIER): | http://dx.doi.org/10.1016/j.egypro.2011.02.634 |
| Date Other: | Sat, 1 Jan 2011 00:00 -0600 |
| Publisher: | |