Ground water in the North Side Pumping Division, Minidoka Project, Minidoka County, Idaho

Circular 371
Prepared on behalf of the United States Bureau of Reclamation, and in cooperation with the Idaho State Department of Reclamation
By:  and 

Links

Abstract

The U. S. Bureau of Reclamation proposes to irrigate about 64, 000 acres, largely in southern Minidoka County north and west of the Snake River, with ground water from 175 wells; 13, 650 additional acres would receive surface water pumped to a high-line canal from Lake Milner. More than 20,000 additional acres nearby is being developed by private capital. Completion of the Federal reclamation project will more than double the irrigated acreage in the North Side Division of the Minidoka Project. The area to be irrigated with ground water is at the south-central edge of the Snake River Plain adjacent to project lands that have been irrigated for many years with Snake River water.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Ground water in the North Side Pumping Division, Minidoka Project, Minidoka County, Idaho
Series title Circular
Series number 371
DOI 10.3133/cir371
Year Published 1956
Language English
Publisher U.S. Geological Survey
Description Report: iii, 20 p.; 1 Map: 21.34 x 16.24 inches
Country United States
State Idaho
County Minidoka
Google Analytic Metrics Metrics page
Additional publication details