thumbnail

Geology Highlights for Ride the Rockies 2009

General Information Product 88

By:

Links

Abstract

The author provides a brief description of the geology along the route for each day of the ride, from June 14 through June 19, 2009. Ride the Rockies begins and ends in Glenwood Springs, with stops in Hotchkiss, Gunnison, Salida, Leadville, Aspen, and back to Glenwood Springs, Colorado. A small, generalized geologic map also is shown.

Additional Publication Details

Publication type:
Report
Publication Subtype:
USGS Numbered Series
Title:
Geology Highlights for Ride the Rockies 2009
Series title:
General Information Product
Series number:
88
Edition:
-
Year Published:
2009
Language:
ENGLISH
Publisher:
U.S. Geological Survey
Contributing office(s):
U.S. Geological Survey
Description:
2 p.
Time Range Start:
2006-06-14
Time Range End:
2006-06-19