Geology highlights for Ride the Rockies 2009

General Information Product 88
By:

Links

Abstract

The author provides a brief description of the geology along the route for each day of the ride, from June 14 through June 19, 2009. Ride the Rockies begins and ends in Glenwood Springs, with stops in Hotchkiss, Gunnison, Salida, Leadville, Aspen, and back to Glenwood Springs, Colorado. A small, generalized geologic map also is shown.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Geology highlights for Ride the Rockies 2009
Series title General Information Product
Series number 88
DOI 10.3133/gip88
Year Published 2009
Language English
Publisher U.S. Geological Survey
Contributing office(s) U.S. Geological Survey
Description 2 p.
Time Range Start 2006-06-14
Time Range End 2006-06-19
Country United States
State Colorado
Google Analytic Metrics Metrics page
Additional publication details