Geologic interpretation of seismic data relocation route 1: proposed cut at stations 127-135 in Danvers, Mass.

Open-File Report 50-43-B
Cooperative Geologic Project
By:  and 

Links

Abstract

The layout for the reconstruction of the Newburyport Turnpike (Route 1) proposed cit at stations 127-135, in Danvers, Mass., shows a deep cut through the western end of a hill between stations 127 and 135. Because of the depth of this cut seismic work was done at the site in September 1949. The work constitutes part of the cooperative program of the Department of Public Works and the United States Geological Survey.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Geologic interpretation of seismic data relocation route 1: proposed cut at stations 127-135 in Danvers, Mass.
Series title Open-File Report
Series number 50-43
Chapter B
DOI 10.3133/ofr5043B
Year Published 1950
Language English
Publisher U.S. Geological Survey
Description 2 p.
Country United States
State Massachusetts
City Danvers
Google Analytic Metrics Metrics page
Additional publication details