Geologic interpretation of seismic data, relocation Route 1 cut, Stations 25-36 Ballard Estate in Topsfield, Mass.

Open-File Report 50-45
By:  and 

Links

Abstract

This investigation was undertaken to determine the surface and subsurface conditions between stations 25 and 36 of the proposed relocation of the Newburyport Turnpike, Route 1, Topsfield, Mass. Reconnaissance seismic work was performed at the site in September 1949. Because that work showed bedrock near the surface over an extensive area where a deep cut was to be made, a more detailed program of seismic work was performed in September, October, and November 1949. This report comprises all of the seismic work performed at the site. It was done as part of a cooperative project of the Massachusetts Department of Public Works and the United States Geological Survey.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Geologic interpretation of seismic data, relocation Route 1 cut, Stations 25-36 Ballard Estate in Topsfield, Mass.
Series title Open-File Report
Series number 50-45
DOI 10.3133/ofr5045
Year Published 1950
Language English
Publisher U.S. Geological Survey
Description 4 p.
Country United States
State Massachusetts
City Topsfield
Other Geospatial Ballard Estate
Google Analytic Metrics Metrics page
Additional publication details