thumbnail

Bathymetric map, area/capacity table, and sediment volume estimate for Millwood Lake near Ashdown, Arkansas, 2013

Scientific Investigations Map 3282

Prepared in cooperation with U.S. Army Corps of Engineers
By:
and
DOI: 10.3133/sim3282

Links

Abstract

Millwood Lake, in southwestern Arkansas, was constructed and is operated by the U.S. Army Corps of Engineers (USACE) for flood-risk reduction, water supply, and recreation. The lake was completed in 1966 and it is likely that with time sedimentation has resulted in the reduction of storage capacity of the lake. The loss of storage capacity can cause less water to be available for water supply, and lessens the ability of the lake to mitigate flooding. Excessive sediment accumulation also can cause a reduction in aquatic habitat in some areas of the lake. Although many lakes operated by the USACE have periodic bathymetric and sediment surveys, none have been completed for Millwood Lake. In March 2013, the U.S. Geological Survey (USGS), in cooperation with the USACE, surveyed the bathymetry of Millwood Lake to prepare an updated bathymetric map and area/capacity table. The USGS also collected sediment thickness data in June 2013 to estimate the volume of sediment accumulated in the lake.

Study Area

Additional Publication Details

Publication type:
Report
Publication Subtype:
USGS Numbered Series
Title:
Bathymetric map, area/capacity table, and sediment volume estimate for Millwood Lake near Ashdown, Arkansas, 2013
Series title:
Scientific Investigations Map
Series number:
3282
DOI:
10.3133/sim3282
Year Published:
2013
Language:
English
Publisher:
U.S. Geological Survey
Publisher location:
Reston, VA
Contributing office(s):
Missouri Water Science Center
Description:
Map: 36 x 34 inches
Country:
United States
State:
Arkansas
Other Geospatial:
Millwood Lake
Datum:
North American Datum of 1983
Projection:
Universal Transverse Mercator projection
Online Only (Y/N):
Y