| Abstract: | Failure of the debris dam, blocking the outflow of Spirit Lake near Mount St. Helens, could result in a mudflow down the Toutle and Cowlitz Rivers into the Columbia River. Flood elevations at the Trojan Nuclear Power Plant on the Columbia River, 5 mi upstream from the Cowlitz River, were simulated with a hydraulic routing model. The simulations are made for four Columbia River discharges in each of two scenarios, one in which Columbia River floods coincide with a mudflow and the other in which Columbia River floods follow a mudflow sediment deposit upstream from the Cowlitz River. In the first scenario, Manning ‘s roughness coefficients for clear water and for mudflow in the Columbia River are used; in the second scenario only clear water coefficients are used. The grade elevation at the power plant is 45 ft above sea level. The simulated elevations exceed 44 ft if the mudflow coincides with a Columbia River discharge that has a recurrence interval greater than 10 years (610,000 cu ft/sec); the mudflow is assumed to extend downstream from the Cowlitz River to the mouth of the Columbia River, and Manning ‘s roughness coefficients for a mudflow are used. The simulated elevation is 32 ft if the mudflow coincides with a 100-yr flood (820,000 cu ft/sec) and clear-water Manning ‘s coefficients are used throughout the entire reach of the Columbia River. The elevations exceed 45 ft if a flow exceeding the 2-yr peak discharge in the Columbia River (410,000 cu ft/sec) follows the deposit of 0.5 billion cu yd of mudflow sediment upstream of the Cowlitz River before there has been any appreciable scour or dredging of the deposit. In this simulation it is assumed that: (1) the top of the sediment deposited in the Columbia River is at an elevation of 30 ft at the mouth of the Cowlitz River, (2) the surface elevation of the sediment deposit decreases in an upstream direction at a rate of 2.5 ft/mi, and (3) clear water Manning ‘s coefficients apply to the entire modeled reach of the Columbia River. (Author ‘s abstract) |
| Genre: | USGS Numbered Series |
| ProdID: | 28129 |
| Citation Author: | Kresch, D. L.; Laenen, Antonius |
| Citation Contributing Office: | |
| Citation Datum: | |
| Citation Day: | |
| Citation Edition: | - |
| Citation Editor: | |
| Citation End Page: | |
| Citation Issue: | |
| Citation Keywords: | |
| Citation Language: | ENGLISH |
| Citation Larger Work Title: | |
| Citation LatN: | |
| Citation LatS: | |
| Citation LonE: | |
| Citation LonW: | |
| Citation Month: | |
| Citation No Pagination: | |
| Citation Number Of Pages: | |
| Citation Online Only Flag: | |
| Citation Phsyical Description: | iv, 11 p. :map ;28 cm. |
| Citation Projection: | |
| Citation Public Comments: | |
| Citation Publisher: | U.S. Geological Survey, |
| Citation Series: | Water-Resources Investigations Report |
| Citation Series Code: | WRI |
| Citation Series Number: | 83-4197 |
| Citation Search Results Text: | Preliminary estimate of possible flood elevations in the Columbia River at Trojan Nuclear Power Plant due to failure of debris dam blocking Spirit Lake, Washington; 1984; WRI; 83-4197; Kresch, D. L.; Laenen, Antonius |
| Citation Start Page: | |
| Citation Volume: | |
| Citation Year: | 1984 |
| Type: | citation/reference |
| Text: | Preliminary estimate of possible flood elevations in the Columbia River at Trojan Nuclear Power Plant due to failure of debris dam blocking Spirit Lake, Washington; 1984; WRI; 83-4197; Kresch, D. L.; Laenen, Antonius |
| URL (THUMBNAIL): | http://pubs.usgs.gov/wri/1983/4197/report-thumb.jpg |
| URL (DOCUMENT): | http://pubs.usgs.gov/wri/1983/4197/report.pdf |
| Date Other: | Sat, 1 Jan 1994 00:00 -0600 |
| Publisher: | U.S. Geological Survey, |