Ecological requirements for pallid sturgeon reproduction and recruitment in the Lower Missouri River: Annual report 2009

Open-File Report 2010-1215
Prepared in cooperation with the Missouri River Recovery-Integrated Science Program U.S. Army Corps of Engineers, Yankton, South Dakota
By: , and 

Links

Abstract

The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The general Comprehensive Sturgeon Research Project strategy is to integrate field and laboratory studies of sturgeon reproductive ecology, habitat requirements, and physiology to produce a predictive understanding of sturgeon population dynamics. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery-Integrated Science Program. The research consists of several interdependent and complementary research tasks engaging multiple disciplines that primarily address spawning as a probable limiting factor in reproduction and survival of the pallid sturgeon. The research is multifaceted and is designed to provide information needed for management decisions impacting habitat restoration, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research activities and progress towards understanding of the species are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by Comprehensive Sturgeon Research Project during 2009.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Ecological requirements for pallid sturgeon reproduction and recruitment in the Lower Missouri River: Annual report 2009
Series title Open-File Report
Series number 2010-1215
DOI 10.3133/ofr20101215
Edition -
Year Published 2010
Language ENGLISH
Publisher U.S. Geological Survey
Contributing office(s) Columbia Environmental Research Center
Description viii, 64 p.
Time Range Start 2009-01-01
Time Range End 2010-12-31
Projection Universal Transverse Mercator
Online Only (Y/N) N
Additional Online Files (Y/N) N
Google Analytic Metrics Metrics page
Additional publication details