Geologic and seismic investigations, relocation of Route 3, grade separation at Route 62, southeast ramp in Bedford, Mass.

Open-File Report 54-190
By:

Links

Abstract

The relocation of Route 3 in Bedford, Mass. requires extensive cuts for a grade separation at Route 62. This report contains only the results of the geologic and seismic studies that were made for the purpose of obtaining information that would aid in the construction of the inner and outer loops of the southeast ramp. The studies represent part of a cooperative program of the Massachusetts Department of Public Works and the United States Geological Survey. The work was performed in July 1953.


The site is located in the Wilmington and Lexington 7-1/2-minute quadrangle maps of the United States Geological Survey. Mr. M. E. Chandler and Mr. W. L. Carney, Massachusetts Department of Public works' Engineers, performed all pertinent survey work required for this project, and prepared the essential plans and profiles. Mr. Chandler also operated the seismic equipment and assisted in the preparation of the seismic velocity data.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Geologic and seismic investigations, relocation of Route 3, grade separation at Route 62, southeast ramp in Bedford, Mass.
Series title Open-File Report
Series number 54-190
DOI 10.3133/ofr54190
Year Published 1954
Language English
Publisher U.S. Geological Survey
Publisher location Boston, MA
Description 2 p.
Country United States
State Massachusetts
City Bedford
Google Analytic Metrics Metrics page
Additional publication details