Geologic interpretation of seismic data, relocation of Route 3 at Route 62, northwest ramps and approach for Route 62 in Bedford, Mass.

Open-File Report 54-191
Supplementary report
By:

Links

Abstract

Geologic and seismic studies were made at this site in October 1961 primarily for obtaining data that would aid in estimating the quantities of materials to be excavated from the cut required for the construction of Route 3. A report in the geology of the site together with the interpretation of the seismic data that were obtained at this time was submitted by Robert O. Castle and Robert M. Haslewood (file report of October 1951). Additional seismic work was performed at this site in July 1953. This later work was done to obtain information that would help in planning for the construction of the inner and outer loops of the northwest ramp, and the western approach of Route 62 to Route 3. This report contains the geologic interpretation of the supplementary seismic data that were obtained during the July 1953 survey. The work was performed as a part of a cooperative project of the Massachusetts Department of Public Works and the United States Geological Survey.


Mr. M. E. Chandler and Mr. W. L. Carney, Department of Public Works' Engineers, performed all pertinent survey work required for this project, and prepared the essential plans and profiles. Mr. Chandler also operated the seismic equipment and assisted in the preparation of the seismic velocity data.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Geologic interpretation of seismic data, relocation of Route 3 at Route 62, northwest ramps and approach for Route 62 in Bedford, Mass.
Series title Open-File Report
Series number 54-191
DOI 10.3133/ofr54191
Year Published 1954
Language English
Publisher U.S. Geological Survey
Publisher location Reston, VA
Description 2 p.
Country United States
State Massachusetts
City Bedford
Google Analytic Metrics Metrics page
Additional publication details