Four core-material-sampling sites and one bottom-material site were chosen by the U.S. Army Corps of Engineers to represent areas of proposed dredging activity along a 24.9-mile reach of the upper Yazoo River. Five receiving-water sites also were selected to represent the water that will contact the proposed dredged material. Chemical and physical analyses were performed upon core or bottom material and native-water (receiving-water) samples from these sites as well as upon elutriate samples of the mixture of sediment and receiving water. The results of these analyses are presented without interpertation. (USGS)