Level II scour analysis for Bridge 43 (HARDTH00CU0043) on Church Street, crossing the Lamoille River, Hardwick, Vermont

Open-File Report 96-745
Prepared in cooperation with Vermont Agency of Transportation and Federal Highway Administration
By:

Links

Abstract

This report provides the results of a detailed Level II analysis of scour potential at structure HARDTH00CU0043 on Church Street crossing the Lamoille River, Hardwick, Vermont (figures 1–8). A Level II study is a basic engineering analysis of the site, including a quantitative analysis of stream stability and scour (U.S. Department of Transportation, 1993). Results of a Level I scour investigation also are included in Appendix E of this report. A Level I investigation provides a qualitative geomorphic characterization of the study site. Information on the bridge, gleaned from Vermont Agency of Transportation (VTAOT) files, was compiled prior to conducting Level I and Level II analyses and is found in Appendix D. The site is in the New England Upland section of the New England physiographic province in north-central Vermont. The 87.6-mi2 drainage area is in a predominantly rural and forested basin. In the vicinity of the study site, the surface cover is best characterized as suburban except for the downstream right surface cover which is pasture. In the study area, the Lamoille River has an incised, straight channel with a slope of approximately 0.004 ft/ft, an average channel top width of 90 ft and an average channel depth of 8 ft. The predominant channel bed materials are cobble and gravel with a median grain size (DM50) of 99.5 mm (0.327 ft). The geomorphic assessment at the time of the Level I and Level II site visit on July 26, 1995, indicated that the reach was stable. The Church Street crossing of the Lamoille River is a 100-ft-long, two-lane bridge consisting of one 97-foot steel-beam span (Vermont Agency of Transportation, written communication, March 17, 1995). The bridge is supported by a vertical, stone abutment with wingwalls on the left and a vertical concrete abutment with a stone spill-through slope on the right. The channel is skewed approximately 5 degrees to the opening while the opening-skew-to-roadway is 0 degrees. Additional details describing conditions at the site are included in the Level II Summary and Appendices D and E. Scour depths and rock rip-rap sizes were computed using the general guidelines described in Hydraulic Engineering Circular 18 (Richardson and others, 1995). Total scour at a highway crossing is comprised of three components: 1) long-term streambed degradation; 2) contraction scour (due to accelerated flow caused by a reduction in flow area at a bridge) and; 3) local scour (caused by accelerated flow around piers and abutments). Total scour is the sum of the three components. Equations are available to compute depths for contraction and local scour and a summary of the results of these computations follows. Contraction scour for all modelled flows ranged from 0.0 to 0.8 ft. The worst-case contraction scour occurred at the incipient-overtopping discharge. Abutment scour ranged from 6.2 to 10.9 ft at the left abutment with worst-case occurring at the incipientovertopping discharge. Abutment scour ranged from 8.5 to 12.3 ft at the right abutment with worst-case occurring at the 500-year discharge. Additional information on scour depths and depths to armoring are included in the section titled “Scour Results”. Scoured-streambed elevations, based on the calculated scour depths, are presented in tables 1 and 2. A crosssection of the scour computed at the bridge is presented in figure 8. Scour depths were calculated assuming an infinite depth of erosive material and a homogeneous particle-size distribution. It is generally accepted that the Froehlich equation (abutment scour) gives “excessively conservative estimates of scour depths” (Richardson and others, 1995, p. 47). Usually, computed scour depths are evaluated in combination with other information including (but not limited to) historical performance during flood events, the geomorphic stability assessment, existing scour protection measures, and the results of the hydraulic analyses. Therefore, scour depths adopted by VTAOT may differ from the computed values documented herein.

Study Area

Publication type Report
Publication Subtype USGS Numbered Series
Title Level II scour analysis for Bridge 43 (HARDTH00CU0043) on Church Street, crossing the Lamoille River, Hardwick, Vermont
Series title Open-File Report
Series number 96-745
DOI 10.3133/ofr96745
Year Published 1996
Language English
Publisher U.S. Geological Survey
Publisher location Pembroke, NH
Description iv, 52 p.
Country United States
State Vermont
City Hardwick
Other Geospatial Lamoille River
Scale 24000
Google Analytic Metrics Metrics page
Additional publication details